CompTIA認(rèn)證考試SK0-002單項(xiàng)選擇題每日一練(2019.01.16)
來(lái)源:考試資料網(wǎng)
1
Acceptance of deliverables to multiple locations requires which type of sign off?()
點(diǎn)擊查看答案
2
What is a reason for reviewing the user requirements document with the client?()
點(diǎn)擊查看答案
3
Why does a project manager need an executive sponsor?()
點(diǎn)擊查看答案
4
The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()
點(diǎn)擊查看答案
5
Which throughput does a 33 MHz, 33-bit bus have?()
點(diǎn)擊查看答案